Section 2 Uniden 8734 I 8719
Chassis (11.3258 crystal) 1. Step #4: Locate
8207 and cut one lead. Fig.
4 - Schematic Diagram Fig.
5 - Test Point Location This completes the installation procedure. Before operation. the DS-400 must be programmed and the radio must be realigned. Go to the programming section and proceed. |